Authority monitoring report AMR
Local plans are prepared by local planning authorities. They create the framework for the future development of an area and are the starting-point for considering whether planning applications should be approved.
Local development schemes (LDS) set out the programme for preparing the development plan documents (DPD) that will make up the local plan.
The Planning and Compulsory Purchase Act 2004 introduced a requirement for local planning authorities to make an annual report to the Secretary of State about the implementation of the local development scheme and the extent to which the policies set out in the local plan were being achieved. This was referred to as an Annual Monitoring Report, which had to be published as a single document on a specific date.
However, section 113 of the Localism Act 2011 amended this requirement, renaming the report the Authority Monitoring Report (AMR), allowing it to be published annually rather than on a specific date, and removing the requirement for it to be a single report. This gives local authorities the flexibility to publish a number of component documents when information becomes available, which together make up the AMR. The authority must make these reports available to the public.
The minimum information an AMR should contain is defined in Regulation 34 of the Town and Country Planning (Local Planning) (England) Regulations 2012. It should:
- Set out progress with local plan preparation.
- Report on activities relating to the duty to cooperate.
- Describe how the implementation of policies in the local plan is progressing.
It may also provide information about the implementation of any neighbourhood plans, and whether there is a need to undertake a partial or full review of the local plan, and may highlight how contributions made by development have been used, such as planning obligations, the community infrastructure levy and new homes bonus payments.
NB the National Infrastructure Commission also publishes an Annual Monitoring Report, setting out its views on the government’s progress over the past year in delivering infrastructure.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.